Case Studies
Live Projects
Morello II Amenity
Lewisham Gateway
Southbank Penthouse 2001



MORELLO II AMENITY
Client: Europa
PM/QS: Cast Consultancy
Project Handover Date: Ongoing
Project Value: Approx. £3,500,000.00
Contract: JCT Design and Build
Scope of works:
Full interior fit out of the reception area and amenity spaces for 2no residential towers in East Croydon.
Bespoke reception desks
Microcement flooring / skirting
Fire rated atrium windows
Bespoke joinery items including bench and window seating
Wall linings, partitions & ceilings
Full MEP design and install


LEWISHAM GATEWAY
Client: Get Living
PM/QS: Cast Consultancy
Project Handover Date: Ongoing
Project Value: Approx. £1,500,000.00
Contract: JCT Design and Build
Scope of works:
This project involves the Amenity fit out to Lewisham Gateway. The scope of works is as below:
Strip out existing doors and blockwork wall
New internal partitions
New MF ceiling
Installation of new internal doors
RAF system, with vinyl flooring installed
New residents kitchen and staff kitchen
Resident WC, DDA WC and new Staff WC
Full MEPH installation



SOUTHBANK PENTHOUSE 2001
Client: Braeburn Estates/ Canary Wharf
PM/QS: Cast Consultancy
Project Handover Date: Ongoing
Project Value: Approx. £2,000,000.00
Contract: JCT Design and Build
Scope of works:
This project involves the interior fit-out of penthouse 2001 in Southbank. It currently has Stage 3 design information completed, and RJM are proceeding with the Stage 4 design and construction works. The scope of works includes:
Full MEP installation (1st and 2nd fix)
Demolition and modification of internal partitioning
New floor finishes throughout
New wall and ceiling finishes throughout
Set up of lighting system
Installation of new kitchen and sanitaryware
Joinery installation
Commercial
18-21 Corsham Street
Riverstone Fulham Pier
28 Austin Friars London
Ramillies House Soho
Earls Court Project Rooms
22-24 Corsham Street
6 Dowgate Hill
Paramount Pitching and Reception Room
Paramount Hot Offices



18-21 CORSHAM STREET LONDON
Client: JWG Properties
PM: TMD Building Consultancy
Project Handover Date: May 2024
Project Value: £1,800,000.00
Contract: JCT Design and Build
Scope of works:
Full strip out of all existing floor finishes, ceilings, MEP services, tea points
New 1 hour fire barrier ceilings throughout
New floor finishes
New WC’s and showers to each floor
New staircase between the ground floor and the basement
Cat A+ to first floor space



RIVERSTONE FULHAM PIER
Client: Riverstone Living
PM: Cast Consultancy
Project Handover Date: November 2023
Project Value: £910,000.00
Contract: JCT Design and Build
Scope of works:
Strip out all existing floor finishes, partitions, ceilings and redundant MEP services.
Validate existing MEPH equipment.
Replace and reconfigure MEPH equipment to suit new open plan layout.
Formation of new kitchen space.
Full redecoration and new floor finishes.




28 AUSTIN FRIARS LONDON
Client: EPIC Property Asset Management
PM: TMD Building Consultancy
Project Handover Date: May 2022
Project Value: £600,000.00
Contract: JCT Contract with Contractor’s Design
Scope of works:
Upgrade of the landlords communal areas including WC’s,
shower rooms and bike store
CAT A + fit out over 4 floors of office space
Design, manufacture and install feature reception cladding



Earls Court Project Rooms
Client: Earls Court Development Company
PM: Gardiner and Theobald
Cost Consultant: Cast Consultancy
Project Handover Date: August 2022
Project Value: £400,000.00
Contract: JCT Contract with Contractor’s Design
Scope of works:
Adaptations to existing office space. Upgrade to furniture, lighting and various floor and wall finishes.
Formation of new toilet and shower area.



22-24 Corsham Street London
Client: JWG Properties
PM: TMD Building Consultancy
Project Handover Date: January 2022
Project Value: £650,000.00
Contract: 2 Stage Tender – JCT Contract with Contractor’s Design
Scope of works:
Design and installation of new heating and cooling services throughout all floors
Formation of new office spaces with glazed screens
New tea points


Ramillies House Soho
Client: JWG Properties
PM: TMD Building Consultancy
Project Handover Date: March 2022
Project Value: £1,600,000.00
Contract: JCT Design and Build
Scope of works:
Design and installation of new heating and cooling systems
across all 6 floors of an occupied beauty college including
formation of new roof plant area.
Small power and lighting upgrade.
The works were completed throughout a 16 month period
whilst the college was in full occupation, housing 200 students.





Paramount Reception and Pitching Room
Client: Paramount
Project Handover Date: January 2023
Project Value: £160,000.00
Contract: Client Bespoke
Scope of works:
Feature reception wall cladding, AV upgrade and bespoke furniture.
Creation of feature pitching room with acoustic wall cladding
and bespoke flooring.



Paramount Hot Offices
Client: Paramount
Project Handover Date: January 2023
Project Value: £120,000.00
Contract: Client Bespoke
Scope of works:
Refurbishment of 12 no hot offices including new floor
finishes and acoustic fabric wall cladding.




6 Dowgate Hill
Client: WAG Properties Investments
Project Manager: TMD Building Consultancy
Project Handover Date: July 2023
Project Value: £400,000.00
Contract: JCT Design and Build
Scope of works:
CAT A refurbishment 1st & 2nd floor office, reception & common parts at 6 Dowgate Hill. The works consist of the following:
Strip out 1st and 2nd floor offices back to a generally open plan layout, retaining tea point and MEPH equipment.
Validate existing MEPH equipment.
Replace and/or reconfigure MEPH equipment to suit new open plan layout.
Reconfigure tea point including replace door fronts, side panels and splashbacks.
Full redecoration and new floor finishes.
Light touch refurbishment of the reception and common parts.
Shop Fitting
Messika Covent Garden
Bucherer Covent Garden
Liberty Beauty Expansion
Rolex Bucherer Selfridges
Tudor Watch Boutique Covent Garden
Liberty Pop-Up Battersea Power Station
Bucherer White City



MESSIKA COVENT GARDEN
Client: Messika
Project Handover Date: October 2023
Project Value: £650,000.00
Contract: 2 Stage Tender – JCT Contract with Contractor’s Design
Scope of works:
Complete refurbishment of an existing retail site including full strip out.
MEP design and installation.
Integration of services with existing store and Royal Opera House services.
Installation of RC4 secure shopfront and associated security elements.
Bespoke joinery, wall and floor finishes.



BUCHERER COVENT GARDEN
Client: Bucherer
Project Handover Date: September 2022
Project Value: £1,500,000.00
Contract: Competitive Tender – JCT Contract with Contractor’s Design
Scope of works:
Complete refurbishment of an existing retail site including full strip out.
MEP design and installation.
Integration of services with existing store and Royal Opera House services.
Installation of RC4 secure shopfront and associated security elements.
Bespoke joinery, wall and floor finishes.



LIBERTY BEAUTY EXPANSION
Client: Liberty London
Project Manager: Liberty London
Cost Consultant: Quantem
Project Handover Date: March 2024
Project Value: £400,000.00
Contract: JCT Design and Build
Scope of works:
Refurbishment and joinery installation to the basement floor:
MEP alterations and upgrades.
New wall and ceiling finishes.
Bespoke joinery installation.
Enabling works to accommodate incoming brands.



Rolex Bucherer Selfridges
Client: Bucherer
Project Handover Date: July 2021
Project Value: £500,000.00
Contract: 2 Stage Tender – JCT Contract with Contractor’s Design
Scope of works:
Full MEP installation including small power and data.
New feature pendant lighting and LCM system.
Replacement wall and ceiling finishes.
Bespoke joinery installation.
New floor finish.



Tudor Watch Boutique Covent Garden
Client: Bucherer
Project Handover Date: December 2022
Project Value: £475,000.00
Contract: 2 Stage Tender – JCT Contract with Contractor’s Design
Scope of works:
Complete refurbishment of an existing retail site including
full strip out.
MEP design and installation.
Integration of services with existing store and Royal Opera
House services.
Installation of RC4 secure shopfront and associated security
elements.
Bespoke joinery and floor finishes.



Liberty Pop-Up Battersea Power Station
Client: Liberty London
Project Handover Date: October 2024
Scope of works:
RJM were tasked to manufacture and install bespoke joinery for the Liberty Pop-Up at Battersea Power Station, all within a 3-week time frame:
Two central display units with illuminated brass framed tops.
Cash desk and product display shelving.
Freestanding plaster-effect partitions with colour graphic application.
Freestanding ‘Tudor’ shopfront with digital display screen.
Existing floral units with scent diffusers wrapped with Liberty designs for new perfumes.



Bucherer White City
Client: Bucherer
Project Manager: TMD Building Consultancy
Project Handover Date: March 2025
Project Value: £1,500,000.00
Contract: JCT Design and Build with Contractors Design
Scope of works:
Complete refurbishment of 2 existing retail sites to combine into one larger Bucherer Store
Strip out and installation of new glass façade
MEP design and installation.
Integration of services with Westfield services
Bespoke joinery and floor finishes
Residential
Riverside Penthouse
Riverstone Private Dining
100 Clerkenwell Road
Denmark House



RIVERSTONE FULHAM,
RIVERSIDE PENTHOUSE
Client: Riverstone Living
PM: Cast Consultancy
Project Handover Date: November 2023
Project Value: £160,000.00
Contract: JCT Design and Build
Scope of works:
Full redecoration throughout the apartment
Fabrication and installation of bespoke joinery items, including bedroom wardrobes and dressing room.
Full kitchen and utility installation, complete with Calcatta Gold worktops





RIVERSTONE KENSINGTON
PRIVATE DINING AREA
Client: Riverstone Living
PM: Cast Consultancy
Project Handover Date: July 2023
Project Value: £214,000.00
Contract: JCT Design and Build
Scope of works:
Strip out and isolation of existing services
New internal partition and door opening
Formation of coffered ceiling and patressing
Alternations to MEPH
Full redecoration and new floor finishes.





100 Clerkenwell Road
Client: Legal and General
PM: TFT Consultants
Cost Consultant: Cast Consultancy
Project Handover Date: August 2022
Project Value: £1,400,000.00
Contract: JCT Design and Build
Scope of works:
Full refurbishment and fit-out of 5 high specification carbon neutral apartments
Bespoke joinery kitchens, and the design and build of a feature cured slatted wall with hidden doorway
Bathroom Installation.
Full redecoration including tiling and herringbone flooring.
New Lighting, LCM and Sprinkler system.



Denmark House
Client: Legal and General
PM: DTZ Limited
Cost Consultant: TMD Building Consultancy
Project Handover Date: January 2024
Project Value: £1,425,000.00
Contract: JCT Design and Build
Scope of works:
Full strip out including isolation of existing services
New internal partitions, wall linings, and ceilings
Joinery and marble installation
Full MEPH installation
Full redecoration and new floor finishes
Amenity Space
Riverstone KRP Information Suite
Bow Square, Southampton
Riverstone Bishops Avenue Information Suite



RIVERSTONE KRP
INFORMATION SUITE
Client: Riverstone Living
Cost Consultant: Cast Consultancy
Project Handover Date: February 2025
Project Value: £1,300,000.00
Contract: JCT Design and Build
Scope of works:
Kings Road Park is the second marketing suite RJM has delivered for Riverstone, following our earlier work at their Highgate marketing suite. This latest space features:
A specialist screening room
Consultation lounges
An open-plan mezzanine office.
As part of the works, we also completed the adjacent show apartment, helping to bring their new development to life for prospective residents.




Fit out & refurbishment works included as part of the scope are as below.
Wall linings, partitions & ceilings
Full MEP design & install
RAF & floor finish install
Joinery install including doors, skirting, window sills
Kitchen/tea point Install
Crittall glazed screens
Decorations throughout
Ramp install



RIVERSTONE BISHOPS AVENUE INFORMATION SUITE
Client: Riverstone Living
PM: Cast Consultancy
Project Handover Date: May 2024
Project Value: £800,000.00
Contract: JCT Design and Build
Scope of works:
RJM have been appointed as main contractor for Riverstone’s Marketing Suite. fit out & refurbishment works, which includes:
New one hour fire rated ceilings
Partitions & ceilings
Floor finishings throughout
Kitchen/tea point installation
Cinema/projector room installation
Decoration throughout
Full joinery design and joinery installation
Full MEP design/install
HOTEL AND LEISURE
Crowne Plaza Gatwick Bar 92
Crowne Plaza Gatwick Reception
Doubletree Hotel Woking – Conference Rooms
Hilton Park Lane Generator Project



Crowne Plaza Gatwick Bar 92
Client: Crimson Hotels
Project Handover Date: July 2024
Project Value: £25,000.00
Scope of works:
This project involved the install of a new manifestation on the existing back bar, as well as a LED tape with a new controller located in the rear staff area.
Additionally, tiles were installed on the bar front, with the removal of the existing polished walnut and chrome strip on the bar fascia, installation of a flexible backing board and new oak-stained moulding on the bar front.
Electrical works also included investigating and repairing the existing bar LED, repairing the chandelier, as well as inspecting and repairing the lobby speaker




Crowne Plaza Gatwick Reception
Client: Crimson Hotels
Project Handover Date: July 2024
Project Value: £180,000.00
Scope of works:
Various interior refurbishments, including new wall and ceiling finishes, lighting upgrades, and furniture modifications.
The scope covers stripping out old elements, installing new wallpapers, timber cladding, and oak detailing.
Electrical upgrades include LED lighting and power alterations.
The reception desk was revamped with new stone and timber cladding. Tiling, furniture, and other decorative elements were also upgraded.



DoubleTree Hotel Woking – Conference Rooms
Client: Crimson Hotels
Project Handover Date: May 2023
Project Value: £330,000.00
Scope of works:
RJM were appointed to complete the interior refurbishment of the existing conference rooms within the Woking DoubleTree (by Hilton) Hotel. Works included:
A replacement of a variety of wall coverings in line with the designer’s proposal and associated decorations.
Maintenance works to the existing sliding door system and change of operation to manual use.
Lighting and lighting control upgrades.
New carpet to the main conference rooms and entrance lobby.
Refresh of finishes to all previously sprayed joinery finishes.



Hilton Park Lane Generator Project
Client: London Hilton On Park Lane
Project Handover Date: Ongoing
Project Value: £1,800,000.00
Scope of works:
Full removal of existing reinforced concrete plinth.
Installation of new galvanised structural steelwork.
Complete M&E containment throughout thebuilding.
Core drilling and fire-stopping across multiple levels.
Tanking works and temporary waterproofing.
Cable pulling from the Level 4 plantroom to the B4 basement, and throughout the building up to floor 29.
Coordination with structural engineers, fire strategist, and Hilton’s on-site teams.
FAÇADE RESTORATION
51-61 Wigmore Street
Zenith House

51-61 Wigmore Street
Client: Tideway Properties
Project Handover Date: August 2022
Project Value: £500,000.00
Contract: 2 Stage Tender – JCT Contract with Contractor’s Design
Scope of works:
Scaffolding access to restore the external façade.
New roof application.
Replacement casement windows.
Full redecoration.
Stone restoration.
Chemical clean.

Zenith House
Client: JWG Properties
PM: TMD Building Consultancy
Project Handover Date: August 2022
Project Value: £250,000.00
Contract: JCT Minor Works
Scope of works:
New roof application.
Replacement casement windows.
Full redecoration.
Stone restoration.
Chemical clean.